ANALISIS BIAYA PERAWATAN DAN PEMELIHARAAN JALAN PERKERASAN KAKU DI KABUPATEN BENGKALIS

Sri Wahyuni, Gunawan Gunawan

Abstract


Along with the increasing population in bengkalis Regency, especially on Jalan Bunga Raya, Bantan District, it is necessary to have safe, comfortable and efficient road conditions to support the economic needs of the community. Jalan Bunga Raya Bantan District is a public road that connects between service centers, with these conditions it is necessary to have good pavement conditions so as not to disturb the comfort of road users.  The method used in calculating maintenance over the life of the plan, which is 20 (twenty) years in the future, is Life Cycle Cost (LCC). Life Cycle Cost (LCC) is a method used to obtain alternatives to various possibilities in decision making and describe the present and future value of a road construction development, namely by calculating and considering inflation and interest rates.The initial construction cost that must be incurred is Rp.1,445,028,545.00. Routine maintenance costs amounted to Rp 95,906,000.00 and Periodic maintenance costs amounted to Rp 1,952,246,000.00. The total maintenance cost by calculating with Average Inflation is IDR 8,523,122,444.82. The total percentage of Initial Cost is 14.496% and the percentage of Maintenance Cost is 85.504%. The analysis results show that the NPV with the average bank interest rate (4.5%) is Rp 4,805,301,346.75. At the highest bank interest rate (5.6%), the NPV is Rp 9,039,238,798.56, while at the lowest bank interest rate (3.5%) the NPV reaches Rp 6,465,780,661.43.


Keywords


Analysis, Cost, Life Cycle Cost, Road Maintenance.

Full Text:

PDF

References


Bengkalis, P. N. (2022). Tugas akhir analisis life cycle cost (lcc) pada pembangunan gedung rusunawa, politeknik negeri bengkalis. Lcc.

Puji Guntur Aditya, T., & Syaiful Amal, A. (2022). Perbandingan Biaya Siklus Hidup Berdasarkan Jenis Perkerasan Pada Ruas Jalan Kabupaten Kediri. Seminar

Administration, F. H. (2012). Life cycle cost analysis. In Federal Highway Administration Asset Management: The State of the Art in Europe from a Life Cycle Perspective (Vol. 9789400727, Issue September). https://doi.org/10.1007/978-94-007-2724-3_6

Abuk, G. M., & Rumbino, Y. (2020). Analisis kelayakan ekonomi menggunakan metode Net Present Value (NPV), metode Internal Rate of Return (IRR) Payback Period (PBP) pada unit Stone Crusher di CV. X Kab. Kupang Prov. NTT. Jurnal Ilmiah Teknologi FST Undana, 14(2), 68–75.

Free, P., Flow, C., & Nilai, T. (2021). Pengaruh Free Cash Flow Terhadap Nilai Perusahaan. Jurnal Riset Akuntansi Dan Bisnis, 21(1), 100–106. https://doi.org/10.30596/jrab.v21i1.6530

Menteri Pekerjaan Umum. (2011). Tata Cara Pemeliharaan dan Penilikan Jalan. Peraturan Menteri Pekerjaan Umum Nomor : 13 /Prt/M/2011 Tentang Tata Cara Pemeliharaan Dan Penilikan Jalan, 1–28




DOI: https://doi.org/10.35314/tekla.v6i1.3506

Copyright (c) 2024 Sri Wahyuni, Gunawan Gunawan


This Journal has been listed and indexed in :

 
View My Stats Creative Commons License
inovtek polbeng by http://ejournal.polbeng.ac.id/index.php/tekla is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License .