Quantity Take Off pada Perencanaan Gedung Apartemen Menggunakan BIM Revit

Seplika Yadi, Effendi Yusuf, Bagus Soebandono

Abstract


The volume of work and materials in construction is one of the important aspects that can affect the budget of a construction as well as the procurement of materials. Small mistakes and the lack of accuracy of an estimator and quantity surveyor can cause cost overruns in the budget of a construction so that a method is needed to minimize the human error. Building Information Modeling (BIM) is one method that can be used to accurately represent materials and construction volumes where modeling utilizes digital modeling to support the Virtual Design and Construction (VDC) process. Revit is a software that implements the BIM system. The advantages of Revit are that apart from having a variety of families and items to support 3D modelling, Revit can do material take-off up to a layer, making it possible to do quantity take off with materials that have many layers. Revit can also detect clash detection which can detect collisions between fields before construction begins, which is very helpful in the construction process.

Keywords


Material Take off, Volume, BIM, Revit, Bill of Quantity

Full Text:

PDF

References


H. Kusumartono, A. Krisbandono, G. Permana, N. Andarwati, A. Indraprastha, A. Widyastuti, A. Irsan, and A. Rahman, Panduan Adopsi BIM dalam Organisasi. Jakarta Selatan: Pusat Litbang Kebijakan dan Penerapan Teknologi, 2018.

DOP. Irawan, A. Trisiana, and S. Sukmawati, “Penerapan Building Information Modeling (BIM) Dalam Analisis Waktu Dan Anggaran Biaya Struktur Dan Arsitektur (Studi Kasus: Gedung Fakultas Ilmu Komputer Universitas Jember),†Journal of Applied Civil Engineering and Infrastructure Technology, vol. 2(1), pp. 35–39, 2021.

A. Yudi, MS. Ulum, M.T. Nugroho, Perancangan Detail Engineering Design Gedung Bertingkat Berbasis Building Information Modeling, 2020.

B. Koo and M. Fischer, “Feasibility study of 4D CAD in commercial construction,†Journal of construction engineering and management, vol. 126 (4), pp. 251–260, 2000.

J. Jupp, “4D BIM for Environmental Planning and Management,†Procedia Engineering, vol. 180, pp. 190–201, 2017.

T.L. McCuen, Scheduling, estimating, and BIM: A profitable combination, AACE International Transactions: BIM11, 2008.

C. Khosakitchalert, N. Yabuki, T. Fukuda, “Improving the Accuracy of BIM-Based Quantity Takeoff for Compound Elements,†Automation in Construction, vol. 106, pp.102891, 2019.

J. Ferrandiz, A Banawi, E. Pena, “Evaluating the Benefits of Introducing BIM Based on Revit in Construction Courses, without Changing the Course Schedule,†Universal Access In The Information Society, vol. 17 (3), pp. 491–501, 2018.




DOI: https://doi.org/10.35314/tekla.v5i1.3422

Copyright (c) 2023 Seplika Yadi, Effendi Yusuf, Effendi Yusuf, Bagus Soebandono, Bagus Soebandono


This Journal has been listed and indexed in :

 
View My Stats Creative Commons License
inovtek polbeng by http://ejournal.polbeng.ac.id/index.php/tekla is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License .