Quantity Take Off pada Perencanaan Gedung Apartemen Menggunakan BIM Revit
Abstract
Keywords
Full Text:
PDFReferences
H. Kusumartono, A. Krisbandono, G. Permana, N. Andarwati, A. Indraprastha, A. Widyastuti, A. Irsan, and A. Rahman, Panduan Adopsi BIM dalam Organisasi. Jakarta Selatan: Pusat Litbang Kebijakan dan Penerapan Teknologi, 2018.
DOP. Irawan, A. Trisiana, and S. Sukmawati, “Penerapan Building Information Modeling (BIM) Dalam Analisis Waktu Dan Anggaran Biaya Struktur Dan Arsitektur (Studi Kasus: Gedung Fakultas Ilmu Komputer Universitas Jember),†Journal of Applied Civil Engineering and Infrastructure Technology, vol. 2(1), pp. 35–39, 2021.
A. Yudi, MS. Ulum, M.T. Nugroho, Perancangan Detail Engineering Design Gedung Bertingkat Berbasis Building Information Modeling, 2020.
B. Koo and M. Fischer, “Feasibility study of 4D CAD in commercial construction,†Journal of construction engineering and management, vol. 126 (4), pp. 251–260, 2000.
J. Jupp, “4D BIM for Environmental Planning and Management,†Procedia Engineering, vol. 180, pp. 190–201, 2017.
T.L. McCuen, Scheduling, estimating, and BIM: A profitable combination, AACE International Transactions: BIM11, 2008.
C. Khosakitchalert, N. Yabuki, T. Fukuda, “Improving the Accuracy of BIM-Based Quantity Takeoff for Compound Elements,†Automation in Construction, vol. 106, pp.102891, 2019.
J. Ferrandiz, A Banawi, E. Pena, “Evaluating the Benefits of Introducing BIM Based on Revit in Construction Courses, without Changing the Course Schedule,†Universal Access In The Information Society, vol. 17 (3), pp. 491–501, 2018.
DOI: https://doi.org/10.35314/tekla.v5i1.3422
Copyright (c) 2023 Seplika Yadi, Effendi Yusuf, Effendi Yusuf, Bagus Soebandono, Bagus Soebandono
This Journal has been listed and indexed in :
inovtek polbeng by http://ejournal.polbeng.ac.id/index.php/tekla is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License .