PERANCANGAN JALAN SULTAN SYARIF KASIM KELURAHAN TANJUNG KAPAL MENUJU DESA DARUL AMAN PADA KM 7 – KM 9 MENGGUNAKAN METODE PDT NO 14 TAHUN 2003
Abstract
Roads are the primary mean of transportation to reach a destination from one place to another espicially for the residents of Tanjung Kapal Village – Darul Aman. The existing condition of Sultan Syarif Kasim Road, which is the research location, consist of class B aggregate as the subbase with a width of 6 meters, which is damaged, at 250 m long, the road is flooded when the high tide reaches 50 cm.
           In the planning of the construction of rigid pavement on Sultan Syarif Kasim Road in Tanjung Kapal Village – Darul Aman Village, Bengkalis Regency the PDT method No.14-2003 is still used compared to other methods. Therefore, the author reviews, designs, and plans Sultan Syarif Kasim Road in Tanjung Kapal Village to obtain the desired pavement thickness and the required budget plan.
           After calculating the thickness of the rigid pavement using the PDT method No.14 – 2003, the result obtained is 200 mm or 20 cm. With the result, the flooded location will no longer experience flooding due to tidal fluctuations. The total budget required for the plan is Rp 18,913,760,000.00.Keywords
Full Text:
PDFReferences
E. D. Y. Gardjito And U. Kadiri, “Perencanaan Tebal Perkerasan Kaku,†Tek. Sipil, Vol. 2, No. 1, Pp. 1–15, 2012.
D. Kurniawan, “Menggunakan Metode Manual Desain Perkerasan Jalan 2017 Dan Pd T-14-2003 Desa Bantan Timur – Muntai Barat ),†Vol. 2003, P. 2020, 2020.
Pd T-14, “Pd T-14-2003 Tentang Perencanaan Perkerasan Jalan Beton Semen,†P. 52, 2003.
R. Justitia, L. Farhan, L. Djakfar, And H. Bowoputro, “Analisis Perencanaan Trase Jalan Tol Gempol-Mojokerto Route’s Planning Analysis Of Gempol-Mojokerto Highway,†J. Univ. Brawijaya, Vol. 2, No. 1, Pp. 1–13, 2013.
S. A. Ningtias, “Evaluasi Tebal Perkerasan Kaku,†Vol. 3, No. 1, Pp. 284–290, 2020.
Iirms, “Dengan Alat Dcp ( Dynamic Cone Penetrometer ),†2005.
“Pedoman-Survei-Pengumpulan-Data-Kondisi-Jaringan-Jalan Bina Marga.Pdf.â€
M. Al Ikhsan, M. Idham, P. N. Bengkalis, J. B. Alam, S. Alam, And B. Riau, “Pada Wilayah Prioritas ( Studi Kasus Desa Kuala Penaso , Kecamatan Talang Muandau , Bengkalis , Riau ),†Vol. 2, No. 2, Pp. 128–133, 2020.
M. Syafik, “Perancangan Jalan Selatbaru – Pambang Pada Km 34 , 4 – Km 36 , 4 Menggunakan Metode Bina Marga,†Vol. 2, No. 2, Pp. 66–73, 2020.
S. Kasus, P. Retribusi, T. Angkutan, M. Arif, And M. Idham, “Perencanaan Perkerasan Kaku Dengan Menggunakan Menggunakan Metode Pd-T-14-2003,†Vol. 4, No. 2, Pp. 69–74, 2022.
Kementerian Pupr, “Analisis Harga Satuan Pekerjaan Bidang Pekerjaan Umum.,†Kementeri. Pupr, Vol. 122, Pp. 1–20, 2016.
DOI: https://doi.org/10.35314/tekla.v5i2.3494
Copyright (c) 2024 Syarifudin Syarifudin, Guswandi Guswandi, , Mutia Lisya,
This Journal has been listed and indexed in :
inovtek polbeng by http://ejournal.polbeng.ac.id/index.php/tekla is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License .